Al Bateen Wharf Development
The project is located at AL Bateen, Abu Dhabi. The scope of involved the removal of 259,000 cu.m of standing water in a period of 23 days, following which ground water was to be maintained at -5.12 NADD over an area of 42,526 sq.m.
Computer modeling was conducted to refine the design in terms of feasibility & economic viability. A turnkey solution in terms of design, installation, operation & 24 hour maintenance was provided successfully. Multi stage well point ground water control system was installed to maintain required water levels for the duration of works.
The Ground water control system consisted of bulk over pumping multistage, well point system complete with 24 hour supervision.