Al Raha Beach - Abu Dhabi

The project involved providing a pump station capable of pumping 5,000 m3/hour storm water from 5 manholes. The storm water was pumped 600 meters and discharged through a sedimentation tank and finally discharged into the sea.

HDPE line was installed with pumps connected through a common manifold using common discharge. Manifold allowed any of the pump units to operate at a time.