Dubai Sewage Line - Dubai

The project involved emptying the 1000 mm sewage pipeline of 600 cu.m of sewage from an existing wash out chamber from 5.5 m depth. Action supplied pumps capable of pumping 400 cu.m/hr with a suction lift of 5 m and discharge pressure of 5 bar.