Limitless Downtown, Jebel Ali - Dubai

The project involved the design of a storm water drainage system for ground water to be discharged into. The design also involved a temporary pump station and a pipeline of length over 2 km. The temporary pipeline crossed the SZR entering JAFZA. The groundwater was discharged into JAFZA storm drain.

The project operated for a period over 1 year.