Tigerwoods, Tatweer - Dubai
The scope of work involved installing temporary irrigation pipeline supplying 10,000 cu.m/day over a distance of 10.7 Km. Action performed the excavation and installation of underground temporary HDPE pipeline in trench crossing power lines corridor, new and existing roads. ACTION also Installed, commissioned and managed the temporary pumping station, with 100 % backup capacity.
The project was operational for a period of over 2 years.