Engineering and Operational Excellence are at the core of our strategy. We invest heavily in supporting engineering and delivering reliable tools to those who need them most. Discover more about our work below and keep visiting to stay up to date regarding our latest projects.

Project: Kuwait Al-Zour LNG Import Terminal Project Site

Client: Kuwait Integrated Petroleum Industries Company (KIPIC)

The LNGI Project is located 90km south of Kuwait City, near the Border with Saudi Arabia and includes the construction of a regasification factory, storage tanks and marine facilities.​
 

Scope of works:

  • Dewatering of 7,000 linear meters of trench excavation for pipeline installation

  • HDPE butt fusion welding

Project Execution:

  • Installation of wellpoint system with 60 dewatering pumps, as well as the relevant discharge pipe, header pipes and accessories.

  • Employed concurrent drilling and water jetting to achieve maximum quality and efficiency of installation.

  • Carried out HDPE works through welding of pipes ranging from 90mm to 250mm in diameter.

JAZAN Refinery & Marine Terminal Project (JR & TP)

Project: Kuwait Al-Zour LNG Import Terminal Project Site

Client: Kuwait Integrated Petroleum Industries Company (KIPIC)

The LNGI Project is located 90km south of Kuwait City, near the Border with Saudi Arabia and includes the construction of a regasification factory, storage tanks and marine facilities.​
 

Scope of works:

  • Dewatering of 7,000 linear meters of trench excavation for pipeline installation

  • HDPE butt fusion welding

Project Execution:

  • Installation of wellpoint system with 60 dewatering pumps, as well as the relevant discharge pipe, header pipes and accessories.

  • Employed concurrent drilling and water jetting to achieve maximum quality and efficiency of installation.

  • Carried out HDPE works through welding of pipes ranging from 90mm to 250mm in diameter.

ACTION were contracted to conduct the Dewatering activity, to enable the excavation and basement foundation works in the dry.

Requirement - Dewatering of Wharf Retail, Hospitality buildings, and Residential units. 

- Designed and installed a Deep Well Dewatering system, comprising of 120 Deep Wells across the island.

 

Operation and Monitoring of Ground Water Control system- Pump Tests were conducted on site prior to the installation of the dewatering system to determine the aquifer parameters, such as transmissivity and hydraulic conductivity, and data collected was used to validate the Ground Water Control system design.

Bluewater Islands Project

 I'm a paragraph. Click here to add your own text and edit me. It’s easy. Just click “Edit Text” or double click me to add your own content and make changes to the font. Feel free to drag and drop me anywhere you like on your page. I’m a great place for you to tell a story and let your users know a little more about you.

Expolink

Headquarters

Action International Services LLC

Dubai Investments Park - 1

P. O. Box 86987

Dubai

United Arab Emirates

Quick Links

Help

Dubai (+971) 4814 9300  Abu Dhabi (+971) 4814 9498  Muscat (+968) 2459 6882  Doha (+974) 4452 8218  Dammam (+966) 1380 86137 Jeddah (+966) 122 894 177 

Manama (+973) 1742 2011  Kuwait (+965) 9889 7589

©2019 by Action International Services LLC