    48" Subsea Pipeline Flushing - Fujairah

    This scope involved the sea water flushing, pressure testing and chemical cleaning of a 48" subsea pipeline in Fujairah.

  • Image-empty-state.png

    Dubai Municipality Sewage Overpumping

    This scope involved the sewage overpumping of a maximum of 3,700m3/hr from an existing manhole to a newly installed wet well chamber by using suitable lengths of 315mm, 355mm and 450mm HDPE discharge pipes. Each pumping operation took 10 days of continous operations, with multiple suction points on the network being carried out sequentially.

  • Image-empty-state.png

    Dubai Water Canal

    The scope of works involved transferring over 5.5 million cubic meters of hypersaline water standing within the Business Bay lagoons (8 Lagoons) a distance of over 6km through the city of Dubai to a newly constructed man made peninsula located at JUMEIRAH beach.

  • Image-empty-state.png

    Jeddah Stormwater Drainage - Excavation & Dewatering

    This project was located in Jeddah, Saudi Arabia. The excavation and pipeline works were carried out by Eastern Trading & Cont. Est. The scope of work included design, supply, installation, commissioning and maintenance of a dewatering operation to enable the client to efficiently and safely excavate for pipeline installation and to keep the excavation dry for construction of manholes and junction boxes.

  • Image-empty-state.png

    Palm Jumeirah Vehicular Tunnel Project

    Action dewatered 5.3 million cubic meters of seawater trapped within the cofferdam in only 45 days in preparation for the construction. Action engineered a temporary variable speed pumping solution with a maximum pumping capacity of 180,000 m3 /day to ensure works were carried out within the tight project schedule.

  • Image-empty-state.png

    Qatar Metro - Dewatering

    The scope involved the de-watering of the site to enable construction to be carried out in dry, in safe conditions utilizing a deep well dewatering system.

  • Image-empty-state.png

    ZADCO South Island - Sea Water Supply for Drilling Operations

    This scope involved the supply and operation of a water winning system on the South Island. The system was installed and commissioned in line with HLG guidelines. The system was designed by ACTION and ACTION technicians and operators were used for the duration of the project.

Headquarters

Action International Services LLC

Dubai Investments Park - 1

P. O. Box 86987

Dubai

United Arab Emirates

Help

Dubai (+971) 4814 9300  Abu Dhabi (+971) 4814 9498  Muscat (+968) 2459 6882  Doha (+974) 4496 0100  Dammam (+966) 1380 86137 Jeddah (+966) 122 894 177 

Manama (+973) 1742 2011  Kuwait (+965) 9889 7589

©2020 by Action International Services LLC